Basingstoke
and
Deane
SHLAA
pages
|
Manydown is
under threat by the SHLAA
The
ongoing SHLAA (Strategic Housing Land Availability Assessment) includes
Manydown.
Currently it is proposed that 1350 houses are to be constructed on the
site between
2019 and 2026, although the potential for the construction of up to
8000
houses beyond this period still remains. For full details see extracted pages
from the SHLAA related to Manydown.
The Save Mandyown Group has prepared a response to the inclusion of
Manydown in the SHLAA.
The objections presented by the Savemanydown group during the review of
the local plan are still valid, but the response to the SHLAA has been
updated with recent
findings.
For further
information contact Ted Blackmore-Squires on Basingstoke (01256) 324313
e-mail rebs@boostsurvey.co.uk
|