Basingstoke and Deane SHLAA pages


Manydown is under threat by the SHLAA
The ongoing SHLAA (Strategic Housing Land Availability Assessment) includes Manydown.
Currently it is proposed that 1350 houses are to be constructed on the site between 2019 and 2026, although the potential for the construction of up to 8000 houses beyond this period still remains. For full details see extracted pages from the SHLAA related to Manydown.

The Save Mandyown Group has prepared a response to the inclusion of Manydown in the SHLAA.

The objections presented by the Savemanydown group during the review of the local plan are still valid, but the response to the SHLAA has been updated with recent findings.

For further information contact Ted Blackmore-Squires on Basingstoke (01256) 324313 e-mail rebs@boostsurvey.co.uk
 

© savemanydown.org.uk 2010